KKP4/KKP6: Default time frame unfavorable
[Cost] [default] [default gateway] [default user] [hie] [object] [unfavorable]
Symptom
The intial launch of transaction KKP4 or transaction KKP6 takes very long.
The performance is very low.
Other terms
Cost object hierarchy, CL_COST_OBJECT_TREE, KKP4, KKP6
Reason and Prerequisites
The initial time frame these transactions/reports are called is set to 01/1900 – current period.
Solution
Please apply the attached correction.
By this correction the default time frame is derived from the previous period, i.e. if current date is 01/18/2008 it is set to 12/2007 – 12/2007. Changes of the time frame are memorized as long as the session is active.