Symptom
In the costing run (transaction CK40N), you cannot export the costing results displayed in the analysis section into a spreadsheet.
Other terms
CK40N, XL, Excel, export
Reason and Prerequisites
There is a problem in the program design.
The table to be displayed contains a complex structure. The export into a format for the spreadsheet is not automatically supported [...]
October 28, 2009 at 7:28 am
Symptom
You perform the revenue-based results analysis with manual cost of sales (RA type ‘E’, Profit indicator ‘K’) and with the valuation at the RA line IDs level (Valuation level ‘Z’). Unexpected WIP and cost of sales are created for a RA line ID that does not have actual costs.
Other terms
WIPR, RUCR, COSR, [...]
October 28, 2009 at 5:12 am
Symptom
During the transfer of time data into Controlling, documents were transferred twice.
Other terms
CAT7, RCATSTAL, RCATSTCO, CATS, time data.
Reason and Prerequisites
The problem is caused by a program error.
Solution
To find the time data that was transferred twice, implement one of the programs attached to this note:
Release [...]
October 27, 2009 at 9:10 pm
Symptom
The validity period or the validity periods of a profit center are inconsistent. Owing to overlapping or gaps, this profit center can no longer be maintained using standard transactions. You should use correction report RCEPC_TIME_CORRECTION described in Note 400976.
There are some inconsistencies which this report does not recognize and cannot therefore correct.
Other [...]
October 27, 2009 at 9:10 pm
Symptom
Link to transaction OKEQ incorrect in NA KM353
Solution
Correction to be delivered by Support Package.
Customers wishing to repair this error in their system without uploading a Support Package can do so using the following procedure:
1. Call transaction SE63.2. In the “Initial Screen: Standard Translation Environment” screen, enter shortcut NA in the transaction field. (Alternatively, [...]
October 27, 2009 at 9:07 pm
Symptom
You want to activate the material ledger function. This note describes the recommended procedure.
Other terms
Material ledger, production startup, transaction CKMSTART, report SAPRCKMJ, CNACT, ACTMASTER, parallel currency, actual costs cost estimate
Reason and Prerequisites
This note is relevant for all customers who want to activate the material ledger.
Solution
1. Bear in mind or check the following points before [...]
October 27, 2009 at 9:06 pm
Symptom
During the settlement of an investment measure (order / WBS element with integrated asset under construction), the system displays various error messages, for example:
KD262: ‘Execute amount settlement up to and including settlement period & & first’
KD559: ‘Settlement amount > available amount’
KD565: ‘Debit under cost element & not completely settled’.
In addition, it might happen that [...]
October 27, 2009 at 9:06 pm
Symptom
In single or multi-level price determination, a negative periodic unit price is determined for a material.
However, based on the material price analysis (transaction CKM3), it cannot be determined that the price will be negative.
If no automatic error handling is active, then the